Planning a new church building? Bring sound and video in early

The building committee has met for months. The architect has drawings. Somewhere on the list is “sound system,” usually near the end. That order is the most common and most expensive mistake in church construction.

Why audio and video belong at the start

A sanctuary’s shape, ceiling, and finishes decide how it will sound before a single speaker is chosen. Once the walls are up, fixing an echo means adding treatment to a room that could have been designed right.

Speakers, cameras, screens, and lights need power, wiring, something strong to hang from, and cooling. If those are not in the plans, walls get cut open later, or the system has to settle for whatever space is left.

Committees are often told to choose AV last because it is the last thing installed. It is installed last, but it has to be designed first.

How it gets fixed

  • Design with the architect

    Equipment drawings, what hangs from the ceiling, the power it needs, and the heat it adds go to the architect and builder while the plans can still change.

  • Room acoustics from the start

    Ceiling shape, wall surfaces, and treatment planned so speech is clear and music is full, without adding panels after the fact.

  • Assistive listening planned in

    A loop, Auracast, or receivers decided before the floor is poured, when it is easiest. We’ll help you choose the right option, and your architect can tell you what your local building code says.

  • Reuse what still serves

    Equipment from the old building that still has life in it can be moved and set up again in the new one.

  • A program report the committee can read

    A clear report that explains the system in non-technical language, with 3D renderings of the design choices, so the committee can approve it with confidence.

When to bring audio and video into the project

A simple order that keeps the room, the budget, and the schedule aligned.

  1. 1

    During the vision and schematic phase

    Share how you worship — traditional, blended, or modern — and who you want to reach. That shapes the room itself.

  2. 2

    Before design development is finished

    Get the sound, video, and lighting plans, including power, wiring, and what hangs from the ceiling, into the architect’s drawings.

  3. 3

    Before construction documents are final

    Coordinate with the electrical, mechanical, and structural trades so nothing has to be cut in later.

  4. 4

    During construction

    Wiring goes in alongside the other trades; the equipment is set up and tested once the room is finished.

  5. 5

    Before the first Sunday

    Train your volunteers on the finished system, and have the installation team there for the first service.

Why it matters

A new building is a generational decision. Getting the sound, video, and lighting right is what lets it serve the next forty years of baptisms, sermons, and Sunday mornings instead of fighting them.

It also stewards the gift. Money given for the building goes further when nothing has to be torn out and done twice.

Questions

Our architect says the AV contractor can come in later. Is that true?
The equipment goes in later, but the planning cannot wait. Where things hang, power, wiring, cooling, and how the room sounds are all decided in the drawings. The earlier sound, video, and lighting join the planning, the fewer changes later.
Can we use our existing equipment in the new building?
Often some of it, yes. Central Church in Covington, GA moved its own sound and lighting equipment into a new sanctuary and added a new mixing board and lighting control board.
How do we get this past the building committee?
The Dream phase produces a program report in non-technical language, 3D renderings of the design choices, and initial budgets, written for the people who have to approve it. The Church Room Planner on this site is a good place to start the conversation.

Related

Tell us what you are hearing

A few lines is enough: how many people the room seats, what is not working, and whether you are building or renovating. A church installation team with nearly 30 years of church work will call you, walk your room and design for it.

  • No cost to your church to talk or for the walkthrough.
  • A design for your room and a written proposal. You decide.
  • We are paid by the installer when a church goes ahead, never by your church.

Sanctuary AVL

Tell us about your sanctuary. We will call you back to talk it through.